
Add to Cart
Galvanized Sheet Light Gauge Steel U Stud Roll Forming Machine for Drywall
1. The U Metal Stud And Track Roll Forming Machine of workflow:
Decoiler—Feeding guide---Roll forming---Hydraulic cutting---PLC control cabinet---Run out table
2. U Metal Stud And Track Roll Forming Machine key component:
Decoiler, main forming machine, hydraulic cutting device, PLC control system, hydraulic system,run-out-table
3. Technical parameters of U Metal Stud And Track Roll Forming Machine
1) Decoiler(Optional: Hydraulic Type and Manual type)
Un-powered, Manually control steel coil inner bore shrinkage and stop
Max Feeding width: 600mm,coil ID range 508mm±30mm
Capacity: Max. 3 Ton
2) Main forming machine
A. Shaft material: Shafts Diameter=ф70mm, precision machined
B. Main motor power:7.5kw
C. Forming speed Max.:35m/min or as per request.
D. Voltage:380v,50hz,3ph
E. Roller station:10 stations
3) Cutting system
A. Hydraulic cutter
B. Blade and mould material: Cr12Mov, Heat treatment to HRC58-62 degree
C. Cutting system advanced hydraulic drive, after automatic cutting after forming.no
4) PLC Control system
A. PLC: Schneider from France or Siemens from Germany or Delta from Taiwan for optional.
B. Encoder: Omron (Japan brand)
C. 7-Inch Color Touch Screen: Siemens (German brand)
Cut-to-Length Tolerance≤±1 mm
5) Hydraulic system
A. An advanced hydraulic system from German.
B. Power:3kw
4. Tools And Spare Parts
Toolbox: open wrench 24x22, 22x19, 19x17, 17x14, a hex wrench (size 1 to 10),
a vice, a cross and a flat-head screwdriver, a feeler, iron A hammer, a tape measure;
Spare parts: 1. drive chain x1;2. Drive bearing x2; 3. Shear control travel switch x1.
Other terms:
1. Delivery: In stock
2. Package: export standard package for container
3. Payment: TT (30% by TT in advance,70% by TT after you inspect machine we need)
4. Delivery date: within 35 working days after receiving deposit
5. Products Warranty: Two years, and we will provide Field installation, commissioning and training, Video technical support, Online support.